FOTCO OIL TERMINAL
“Terminal Major Equipments”
Duration (26 – 28 June, 2020 – 3 Days)
=====================================
1. Unloading/loading arrangements
- Design & major components
- Safeties and working envelope
- Trouble shooting
- Inspection & maintenance
2. Emergency shutdown systems (ESDVs)
- Design & major components
- Safeties and operation
- Trouble shooting
- Inspection & maintenance
3. 30″ & 36″ dedicated pipelines & MOVs
- Pipeline layout
- Corrosion prevention & curing techniques
- NDT techniques
- Inspection & maintenance
4. Monitoring System
- Monitoring System
- IMMS
- SCADA
- Heat Tracing
5. Cathodic Protection (CPs System)
- a) Requirements & need
- b) Theoretical analysis & working
6. Fire detection & controlling system
- Major components
- Foaming skid & arrangements
- Fire system interlocking & controls
=====================================